Interchange hub: suburban station, MRTS terminus (about 86 MRTS services a day between Chennai Beach and St Thomas Mount, per News Today, May 2026), and the Green Line metro station (opened 14 Oct 2016).
Also a planned interchange on Metro Line 5. Reached by 51M and 18D buses.
Official departures from the 14 Mar 2026 Annexure-A. 11:05, 19:45 and 21:55 run only to Velachery; the other 43 run to Chennai Beach (arrive 65 min later). First train 05:00, last 22:20. Bands are computed from the departure list: every_min is the median gap between departures in that band, so some gaps are longer.
DO NOT PUBLISH THE LIST AS A TIMETABLE YET. No official Southern Railway timetable for this line could be opened (the 1 Jun 2026 revision was found only as a DT Next report: 106 weekday and 97 Sunday services each way on Beach-Tambaram-Chengalpattu). 'departures_unverified' is erail.in third-party data (cached list stamped 26 Jul 2026). Two spot checks match DT Next (train 40047 now leaves Beach 13:15 and is at St Thomas Mount 13:48; the last Beach train 40091 at 23:59 reaches St Thomas Mount 00:32), but the list holds more trains than the official count and some look duplicated (for example three trains at 00:28), so it probably mixes in old entries. first/last come from the same unverified list; times after midnight belong to the previous evening. Weekday = Monday to Saturday pattern. Times after midnight belong to the previous evening's service. Includes fast/semi-fast trains to or from Arakkonam, Kanchipuram, Tirumalpur and Guduvanchery. AC EMU (separate AC fare) also leaves at: 10:16, 16:18, 18:46. The 1 Nov 2026 revision (LiveChennai) changed some Central-Arakkonam trains and added a Guduvanchery stop on one Arakkonam-Beach semi-fast; it may not be reflected.
DO NOT PUBLISH THE LIST AS A TIMETABLE YET. No official Southern Railway timetable for this line could be opened (the 1 Jun 2026 revision was found only as a DT Next report: 106 weekday and 97 Sunday services each way on Beach-Tambaram-Chengalpattu). 'departures_unverified' is erail.in third-party data (cached list stamped 26 Jul 2026). Two spot checks match DT Next (train 40047 now leaves Beach 13:15 and is at St Thomas Mount 13:48; the last Beach train 40091 at 23:59 reaches St Thomas Mount 00:32), but the list holds more trains than the official count and some look duplicated (for example three trains at 00:28), so it probably mixes in old entries. first/last come from the same unverified list; times after midnight belong to the previous evening. Sunday pattern. Times after midnight belong to the previous evening's service. Includes fast/semi-fast trains to or from Arakkonam, Kanchipuram, Tirumalpur and Guduvanchery. AC EMU (separate AC fare) also leaves at: 16:18, 18:50. The 1 Nov 2026 revision (LiveChennai) changed some Central-Arakkonam trains and added a Guduvanchery stop on one Arakkonam-Beach semi-fast; it may not be reflected.
DO NOT PUBLISH THE LIST AS A TIMETABLE YET. No official Southern Railway timetable for this line could be opened (the 1 Jun 2026 revision was found only as a DT Next report: 106 weekday and 97 Sunday services each way on Beach-Tambaram-Chengalpattu). 'departures_unverified' is erail.in third-party data (cached list stamped 26 Jul 2026). Two spot checks match DT Next (train 40047 now leaves Beach 13:15 and is at St Thomas Mount 13:48; the last Beach train 40091 at 23:59 reaches St Thomas Mount 00:32), but the list holds more trains than the official count and some look duplicated (for example three trains at 00:28), so it probably mixes in old entries. first/last come from the same unverified list; times after midnight belong to the previous evening. Weekday = Monday to Saturday pattern. Times after midnight belong to the previous evening's service. Includes fast/semi-fast trains to or from Arakkonam, Kanchipuram, Tirumalpur and Guduvanchery. AC EMU (separate AC fare) also leaves at: 08:44, 14:47, 17:22. The 1 Nov 2026 revision (LiveChennai) changed some Central-Arakkonam trains and added a Guduvanchery stop on one Arakkonam-Beach semi-fast; it may not be reflected.
DO NOT PUBLISH THE LIST AS A TIMETABLE YET. No official Southern Railway timetable for this line could be opened (the 1 Jun 2026 revision was found only as a DT Next report: 106 weekday and 97 Sunday services each way on Beach-Tambaram-Chengalpattu). 'departures_unverified' is erail.in third-party data (cached list stamped 26 Jul 2026). Two spot checks match DT Next (train 40047 now leaves Beach 13:15 and is at St Thomas Mount 13:48; the last Beach train 40091 at 23:59 reaches St Thomas Mount 00:32), but the list holds more trains than the official count and some look duplicated (for example three trains at 00:28), so it probably mixes in old entries. first/last come from the same unverified list; times after midnight belong to the previous evening. Sunday pattern. Times after midnight belong to the previous evening's service. Includes fast/semi-fast trains to or from Arakkonam, Kanchipuram, Tirumalpur and Guduvanchery. AC EMU (separate AC fare) also leaves at: 14:47, 17:22. The 1 Nov 2026 revision (LiveChennai) changed some Central-Arakkonam trains and added a Guduvanchery stop on one Arakkonam-Beach semi-fast; it may not be reflected.
Green Line trains start here. 'weekdays' here = Monday to Saturday: CMRL lists Mon-Fri and Saturday separately with the same first/last times and frequencies, except that the 3-minute short-loop trains (weekday peaks only) do not run on Saturdays, Sundays or holidays. Between Alandur and Central (via CMBT), Green Line and Airport-Central inter-corridor trains together run every 6 min (peak), 7 min (off-peak) and 15 min (22:00-23:00).
Sundays and holidays. Combined Alandur-Central (via CMBT) frequency: 7 min peak (12:00-20:00), 10 min off-peak, 15 min after 22:00.
Sources:OpenStreetMap (Overpass query, stations), 2026-11-25;Wikipedia: List of Chennai Metro stations;News Today: Adambakkam MRTS station opening delayed again, 2026-05-18;Southern Railway Chennai Division press release PUB/MAS/2026/03/11 'MRTS services extended up to St. Thomas Mount from 14th March 2026', with Annexure-A all-days timetable (images attached to @DrmChennai post), 2026-03-13;erail.in trains between St Thomas Mount and Tambaram (third-party timetable data, fetched 2026-11-26), 2026-11-26;DT Next: New Chennai suburban train timetable from June 1 (30 May 2026), 2026-05-30;CMRL: First and last train timings at terminals, w.e.f. 24.11.2026 (PDF linked from the Time Table page), 2026-11-24;CMRL Time Table page (last updated 24 Nov 2026), 2026-11-24