State report to tribunal: why Madipakkam floods and the works proposed
In 2021, the state told the National Green Tribunal that Madipakkam floods when the Pallikaranai marsh rises. It listed proposed fixes, including a channel from Veerangal Odai to the Radial Road, Rs 117.25 crore of Highways drains and a Rs 205 crore Madipakkam sewerage scheme.
- Case
- O.A. No. 264 of 2020 (SZ), National Green Tribunal
- Filed by
- Additional Chief Secretary / Commissioner of Revenue Administration
- Highways drains proposed
- Rs 117.25 crore (Velachery, Madipakkam, Semmancheri, Perumbakkam)
- Madipakkam sewerage (estimate)
- Rs 205 crore
- Forest Department marsh works
- Rs 10.7 crore proposed
See the place
📍 Radial Road, Kamatchi Hospital junction to Thoraipakkam
Satellite pictures can be a year or more old, so they show the place, not the problem on the day. Newspaper photos belong to the papers, so we don't copy them. Residents' own photos are the best record: send yours and we will add it, with your name if you like.
What the report says
In late 2020, The Hindu reported that water was still standing in many parts of Chennai days after the rain. The National Green Tribunal (NGT), a special court for environment cases, took up the issue on its own. In June 2021 it asked the state's Commissioner of Revenue Administration, who is also the State Relief Commissioner, to file a full report.
The report grouped flood-hit places into areas. Area VIII was Velachery, Pallikaranai, Madipakkam, Medavakkam and Semmancheri. It explained that these places sit around the Pallikaranai marsh, a natural wetland. Its inflow channels have no clear course. So whenever the marsh fills above normal, the homes built nearby are flooded.
What was proposed
Rainwater from Alandur, Adambakkam, Velachery and Madipakkam drains into the Veerangal Odai (a stream) near the Velachery MRTS station. It enters the marsh near the Kaiveli signal and then drains out via the Radial Road, Okkiyam Maduvu and the Buckingham Canal. The Forest Department proposed a channel to carry this water faster to the Radial Road. It also proposed clearing debris from inlets and removing water hyacinth. These works were estimated at Rs 10.7 crore, plus Rs 66 lakh for short-term work.
The Highways Department proposed two large drains, called macro drains, costing Rs 117.25 crore in all, to stop flooding in Velachery, Madipakkam, Semmancheri and Perumbakkam. One was 2.4 km on the Pallavaram-Thoraipakkam Road and OMR-ECR link (Rs 70 crore). The other was 1.7 km on the Medavakkam-Sholinganallur road and the same link (Rs 47.25 crore).
The Corporation proposed three underground drains from the marsh to the South Buckingham Canal, 9.6 km long, for Rs 268.50 crore. Metrowater suggested a 15 MLD (million litres a day) sewage treatment plant for Rs 60 crore and a Madipakkam underground sewerage scheme for Rs 205 crore.
Why it matters for Madipakkam
The report explains in official words what residents have long seen: Madipakkam's flooding is tied to the marsh. Fixing it needs many departments to act together.
What happened next
The Madipakkam sewerage scheme was approved in January 2022 at Rs 256.90 crore, and work began on 1 August 2022. In a 2024 report, Metrowater said it would finish by 31 January 2025. We could not confirm the status of the Veerangal Odai channel or the Highways drains.
Timeline
- 30 Nov 2020The Hindu reports water still standing days after rain; NGT takes up the case.
- 22 Dec 2020NGT forms a joint committee of officials.
- 18 Jun 2021NGT adds the Commissioner of Revenue Administration and asks for a full report.
- Jul-Aug 2021Meetings with all departments, and on the Pallikaranai marsh.
- 2021Final comprehensive report filed.