Video: Madipakkam lake today, and how Madipakkam got its name
மடிப்பாக்கம் ஏரியின் தற்போதைய நிலை | வரலாறு
A short Tamil video from June 2022 looks at the state of Madipakkam lake and offers an explanation of how Madipakkam got its name.
- Format
- Tamil YouTube video, about 7.5 minutes
- Channel
- Silvester's Focus
- Posted
- 21 June 2022
- Lake
- Madipakkam (Karthikeyapuram) lake, Zone 14
What the video shows
This is a video report posted on the Tamil YouTube channel Silvester's Focus on 21 June 2022. Its Tamil title translates as "Madipakkam lake's present state | history". It runs for about seven and a half minutes. The channel's description says it explains the lake's current situation and the reason for the name Madipakkam.
We have not summarised the video's explanation of the name here, because we could not check it against a written source. The video had about 400 views by late November 2026.
About the lake
Madipakkam lake is also called Karthikeyapuram lake. Chennai Smart City Limited lists it at about 1.85 lakh square metres (roughly 45 acres) in Zone 14, division 187. It is fed by the Moovarasampattu tank upstream, through a channel on its western side. The western bund has the walkway and seats; the eastern bund is lined with palm trees, and there is a small island where birds nest.
According to Citizen Matters, the lake bed was deepened by nearly 30 feet in the late 2000s, when sand was dug out for the Velachery MRTS railway. Residents first pooled Rs 3 lakh to strengthen the bund. Later, the MLA gave Rs 42 lakh and the MP gave Rs 1.25 crore from Smart City funds. This paid for the walking path, fencing and a children's park.
Why it matters for Madipakkam
The lake is the heart of Madipakkam's open space. Its history is also a story of the area's growth. Citizen Matters reported that from the late 1990s, building work spread into the lake's catchment, and residents had to fight to stop encroachments.
The lake still faces problems. In 2025, sewage was still entering through inlet channels from upstream lakes and nearby buildings, because underground drainage was not yet complete.
What happens next
Metrowater began work on Madipakkam's underground sewerage system in August 2022. Underground sewerage means closed pipes that carry waste water to a treatment plant. Once homes are connected, less sewage should reach the lake. Metrowater's latest target date that we found was 31 July 2025.