Ward 188 councillor: water and sewer connections for every home come first
In a July 2024 interview, Ward 188 councillor Sameena Selvam said her top goals were water and sewer connections for every home and an end to flooding. She said she was keeping watch on the drain, sewer and Metrowater works in Madipakkam and Ram Nagar.
- Councillor
- Sameena Selvam, Ward 188 (DMK), first term
- Corporation
- Greater Chennai Corporation
- Ration shop
- New one being built from ward fund (Rs 35 lakh fund cited)
- Priorities
- Water and sewer connections, flood control
- Ward Facebook page
- facebook.com/chennaiward188
See the place
📍 Ram Nagar
Satellite pictures can be a year or more old, so they show the place, not the problem on the day. Newspaper photos belong to the papers, so we don't copy them. Residents' own photos are the best record: send yours and we will add it, with your name if you like.
What she said
Citizen Matters interviewed Ward 188 councillor Sameena Selvam on 5 July 2024. She is a first-time councillor from the DMK. The ward stretches from Ram Nagar to Madipakkam.
She said her first priority was proper water and sewer connections for every home, and her second was stopping floods. She also wanted government schemes to reach everyone equally, whatever their party, and wanted residents to follow rules on garbage disposal.
On the big works
Underground drainage (sewer lines), storm-water drains and Metrowater connections were all under way in Madipakkam and Ram Nagar. She said piped water connections had been finished before the drain work began. But workers who did not recognise the pipes damaged them, so Metrowater (CMWSSB) was redoing the connections.
She said she prefers cement roads to tar, and had asked contractors to level roads properly after pipes are laid, because mud roads wash away and leave ditches. She named poor coordination between Metrowater and the electricity board as a reason work stalls.
On floods
Two large canals carry the ward's water to the Pallikaranai marsh. She said the MLA has them desilted before the rains every year, and a contractor had been given the job of clearing the old drains too. After Cyclone Michaung in 2023 pushed water back into homes, she asked for the marsh to be widened and deepened.
Other plans
From her councillor's fund she was building a new ration shop, because the old one near Madipakkam bus stand was no longer usable. She planned a small space there for women's self-help groups. She was also thinking about a library and a gym for women.
How to reach her
She said she prefers to visit sites rather than ask people to come to her office. Problems she cannot solve go first to the Area Engineer, then to the MLA. The ward has an official Facebook page, facebook.com/chennaiward188, which her team runs.