Skip to content
Madipakkam stamp emblem மடிப்பாக்கம் Namma Madipakkam
📞Phone numbersஅவசர எண்கள்
← All roads news
RoadsMay 2025First reported by DT Next

Dug up again and again: Madipakkam streets wait years for proper roads

In Karthikeyapuram, Mahalakshmi Nagar and nearby streets, roads had stayed dug up or unpaved for years by May 2025. Metrowater, the electricity board and the Corporation kept digging one after another. An engineer promised the roads would be fixed.

Areas
Karthikeyapuram, Arul Murugan Nagar, Ponniyamman Kovil Street, Mahalakshmi Nagar
Ward and zone
Ward 187, Zone 14 (Perungudi)
Agencies digging
Metrowater, electricity board (TNEB), Greater Chennai Corporation
Promise
Engineer said it would be 'sorted out soon'; no date

See the place

📍 Ponniyamman Kovil Street

Satellite pictures can be a year or more old, so they show the place, not the problem on the day. Newspaper photos belong to the papers, so we don't copy them. Residents' own photos are the best record: send yours and we will add it, with your name if you like.

What happened

DT Next reported on 23 May 2025 that a large part of Madipakkam in Zone 14 had roads that were dug up, half-finished or never surfaced. The streets named were Karthikeyapuram, Arul Murugan Nagar, Ponniyamman Kovil Street and Mahalakshmi Nagar, reached from Velachery-Tambaram Road and Medavakkam Main Road. The paper placed the area in ward 187.

Residents described dusty, broken streets. A fruit seller said the roads had been like this for at least three years. The area has many bike repair shops, and riders said they keep needing tyre and suspension repairs.

Why it keeps happening

A former councillor described a cycle. Metrowater digs to lay water lines. That damages electricity cables, so the electricity board digs. About a week later sewer work starts, followed by storm-water drain work. A resident said each job is left half done, and takes about two more months to finish. He said the departments do not work together.

Why it matters for Madipakkam

Broken roads are not just uncomfortable. They are a danger for older people walking, for children, and for two-wheeler riders, especially at night and after rain. The digging is part of long-awaited work: piped water and underground drainage. Residents want that work, but they also want the roads put back properly afterwards.

What officials said

The ward 187 councillor, J Sherly Thomas, could not be reached by the paper. A family member spoke for her and said the work was part of the area's long-term development.

An assistant executive engineer said three different works were going on at the same time. Sometimes there are accidents, he said, and then temporary patch repairs are done. He said everything would be sorted out soon.

What happens next

No completion date was given. A week later, on 29 May 2025, the Chief Minister opened the underground drainage scheme for Madipakkam, Pallikaranai and Mugalivakkam. We could not confirm when these streets were relaid.

Sources

  • DT Next: Potholes splinter Madipakkam, residents demand solution, 2025-05 (dtnext.in)
  • DT Next: CM Stalin inaugurates Rs 571.92 crore works of MAWS dept, 2025-05-30 (dtnext.in)

Written for Namma Madipakkam in our own words from the sources above, 26 Nov 2026. Spotted a mistake? Tell us.