Floods2025First reported by JICA

JICA flood master plan for Chennai: what it proposes for our basin

A flood control master plan for Chennai, prepared with the Japan International Cooperation Agency (JICA) and published in February 2025, sets out 20 years of work on the city's rivers, canals, lakes and drains. For south Chennai it focuses on the Pallikaranai marsh and its only outlet, the Okkiyam Maduvu.

Report
Comprehensive Flood Control Master Plan in Urbanized River Basins in Chennai
Prepared by
JICA, with Pacific Consultants, CTI Engineering and Yachiyo Engineering
Indian partners
TN Disaster Risk Reduction Agency, CMDA, Water Resources Department, Corporation
Date
Final summary report, Feb 2025
Timeframe
Phase 1 about 10 years (e.g. 2026-2035); Phase 2 after that

What the report is

This is a long technical report, not a news story. It was prepared by a Japanese team for JICA, Japan's government aid agency. It was made with four Tamil Nadu bodies: the Tamil Nadu Disaster Risk Reduction Agency, the CMDA (the city's planning authority), the Water Resources Department and the Greater Chennai Corporation. Its aim is to give Chennai its first overall plan to control floods.

It covers the Adyar, Cooum and Kosasthalaiyar river basins and the northern part of the Kovalam basin. A basin is the whole area of land that drains into one river or water body.

What it says about south Chennai

The north Kovalam basin lies south of the Adyar river and covers about 290 sq km. The Pallikaranai marsh is at its centre. The basin has 61 tanks and lakes linked to the marsh by drains, and no large river. The only way out for water from the marsh is the Okkiyam Maduvu, which leads to the Buckingham Canal and the sea at Muttukadu.

Most homes in the basin are only 3 to 3.5 metres above sea level, and some are at 2.5 metres. The report found that in a very rare, once-in-100-years storm, about 49 sq km could go under water. It blames the shrinking marsh, lost lakes, missing drain links and a too-small outlet.

What it proposes

For the first phase (about 10 years), the plan proposes:

• a new bypass canal from the Buckingham Canal straight to the sea, near VGP;

• widening, straightening and deepening the Okkiyam Maduvu, plus a short-cut channel;

• gates to stop sea water pushing back up the canal at high tide;

• using the 61 existing tanks to store floodwater, by deepening them;

• pumps to drain low-lying streets.

In the second phase, more pumps would be added to clear water from low spots that still flood. The plan also proposes a 12.5 km underground tunnel to take Adyar floodwater to the sea, with intakes at Kallu Kuttai and Adambakkam lakes to help drain the Velachery area.

Why it matters for Madipakkam

Madipakkam lies in the Pallikaranai marsh watershed, so how fast the marsh can empty affects how long water stands in our streets. Earlier search results suggested that Madipakkam tank appears in the report's water-body tables, but we could not find it in the parts of this very large file that we could read.

What happens next

The report is a plan, not a sanctioned project. It warns that full work may take more than 20 years, and depends on funding and agencies working together. In October 2026 the Water Resources Department was finishing a Rs 27 crore restoration of the Okkiyam Maduvu, which is in line with one of the plan's first-phase steps.

Sources

  • JICA: Comprehensive Flood Control Master Plan in Urbanized River Basins in Chennai (final report summary), 2025 (openjicareport.jica.go.jp)
  • Deccan Chronicle: Okkiyam Maduvu Project To Be Major Gamechanger For S. Chennai, 2026-10-17 (deccanchronicle.com)

Written for Namma Madipakkam in our own words from the sources above, 26 Nov 2026. Spotted a mistake? Tell us.