📊 Report · Chennai Metropolitan Water Supply and Sewerage Board (report to the National Green Tribunal, Southern Zone)

The lake that made the case for Madipakkam's sewers

Reports filed by the 7th Respondent (Chennai Metropolitan Water Supply and Sewerage Board) in O.A. No. 135 of 2020 (SZ), Tribunal on its own motion on the Dinamalar report of 23.07.2020, 'Danger to Puzhuthivakkam Chitheri Lake due to river like flow of sewage water' (report affirmed March 2022, uploaded 6 April 2022; report affirmed 24 May 2022, uploaded 26 May 2022)

A Tamil newspaper report about sewage pouring into Puzhuthivakkam Chitheri lake led the Green Tribunal to open a case in 2020. Metrowater's replies in 2022 describe, in its own words, a Madipakkam without sewers and the plan to build them.

Case
O.A. No. 135 of 2020 (SZ), National Green Tribunal, Southern Zone (suo motu)
Lake
Puzhuthivakkam Chitheri, survey no. 67 of Madipakkam revenue village
Sanction
G.O. (Ms) No. 23, MAWS (MW-1), 31 Jan 2022: Rs 256.90 crore
Tender
One bid received on 10 Mar 2022; price bid under evaluation in May 2022
Scope
100 km gravity sewers, 14 km pumping main, 3,859 manholes, 5 main pumping stations, 4 lift stations, about 11,600 house connections
Why summary only
Reports by a government board filed in a tribunal case, not tribunal orders

What this document is

These are two sworn reports by Metrowater's Superintending Engineer (South) in a case the Tribunal started on its own. The first was affirmed in March 2022 and uploaded on 6 April 2022. The second was affirmed on 24 May 2022, after a Tribunal order of 18 May 2022. Both are posted on the Tribunal's website as reports, not orders.

What it says about Madipakkam

Metrowater says the lake lies in survey number 67 of Madipakkam revenue village, between its depot 169 (Puzhuthivakkam) and depot 188 (Madipakkam). Nineteen streets surround it: eleven on the Puzhuthivakkam side and eight on the Madipakkam side.

On the Puzhuthivakkam side there were sewers, and 836 households had been connected under the 'Illam Thorum Inaippu' scheme. On the Madipakkam side, the report says, underground drainage was 'not available at present'. Its eight streets, with 109 households, including Lakshmi Street, Raja Street and the Thilagar Avenue streets, used septic tanks emptied by tanker lorries.

The March report records that the government gave administrative approval for Madipakkam underground sewerage at Rs 256.90 crore by G.O. (Ms) No. 23 of 31 January 2022, and that one bid came in on 10 March 2022. The May report adds the scope listed above, notes hard soil and rock from about 4 metres down, and says house connections can only be given after the sewer lines, pumping mains and pumping stations are all finished.

What it means for residents

These reports are an official admission that most of Madipakkam had no sewers in 2022, more than ten years after it joined the city. They also set the clock: 30 months from the award of work. After the Tribunal's order of 18 May 2022, Metrowater pointed to tender clauses that give the contractor a 1% bonus for finishing at least 10% early and impose daily damages for delay.

What happened next

By November 2023 Metrowater listed Madipakkam among sewerage schemes 'under progress', and in April 2025 it told the Tribunal the Madipakkam work was due for completion on 31 July 2025. See the 2025 Metrowater report in this library. We could not open the Tribunal's own orders in this case; see 'gaps'.

Timeline

  1. 23 Jul 2020Dinamalar reports sewage flowing into Puzhuthivakkam Chitheri lake; Tribunal takes up the case.
  2. 15 Nov 2021Tribunal order asks for progress on sewer connections (as cited by Metrowater).
  3. 31 Jan 2022G.O. (Ms) No. 23 sanctions Rs 256.90 crore for Madipakkam sewerage.
  4. 10 Mar 2022One bid received.
  5. 24 May 2022Metrowater sets out scope and 30-month timeline.

Sources

  • National Green Tribunal, reports uploaded in O.A. No. 135 of 2020 (SZ) (greentribunal.gov.in)
  • Report by R7 (CMWSSB) in O.A. No. 135 of 2020 (SZ), March 2022, 2022-04-06 (greentribunal.gov.in)
  • Report by R7 (CMWSSB) in O.A. No. 135 of 2020 (SZ), 24 May 2022, 2022-05-26 (greentribunal.gov.in)
  • NGT list of documents in O.A. No. 135 of 2020 (SZ), 2026-11-27 (greentribunal.gov.in)

Explained for Namma Madipakkam in our own words, 27 Nov 2026. This is not legal advice. Spotted a mistake? Tell us.