Ward 188: what the ward's money paid for since 2022
South Madipakkam's councillor used her first fund for a new ration shop. Roads, drains and sewers came from bigger schemes, with long delays on many streets.
- Money
- Rs 35 lakh
- Spent
- Not stated
- Period
- Reported July 2024
Money each year
How much money the ward got
Ward 188 covers south and east Madipakkam, including Ram Nagar South, Perumal Nagar, Sadasiva Nagar and Periyar Nagar, between the lake and the Pallikaranai marsh. Its councillor, S. Sameena (Sameena Selvam) of the DMK, told Citizen Matters in July 2024 that the ward development fund was Rs 35 lakh. It went up to Rs 50 lakh for 2024-25 and Rs 60 lakh for 2025-26, DT Next reported. For 2026-27, only a first part of Rs 30 lakh had been released by 24 September 2026.
The Corporation's budget books do not split this money by ward. They show one line for all 11 wards of Zone 14 (Perungudi), which includes Madipakkam's three wards. Under 'councillor ward improvement works', the zone spent only about Rs 19 lakh in 2022-23, about Rs 3.58 crore in 2023-24 and about Rs 3.27 crore in 2024-25. The zone's figure for 2025-26 was raised to Rs 6.6 crore. These numbers come from the Corporation's 'Budget at a Glance' for each year. They do not say which ward or which work the money paid for.
What was built, street by street
Ration shop. The councillor said her first year's fund was used to rebuild the old ration shop near Madipakkam bus stand, which could no longer be used. The new building has a small space for women's self-help groups. In July 2024 it was still being built. Its cost has not been published.
Roads near the bus stand. In February 2026 work began to repair 16 streets beside the Madipakkam bus stand in ward 188, and Ramamurthy Nagar Main Road and nearby roads. The cost was Rs 84 lakh, from the Corporation's own capital fund, not the ward fund. The then MLA, S. Aravind Ramesh, started the work.
Animal shelters on Tambaram-Velachery Road. In late December 2025 the Corporation began a Rs 4.75 crore dog shelter of about 9,000 sq ft, on the Commissioner's orders. The same campus has an animal birth control centre (Rs 1.5 crore) and a cattle shelter (Rs 2.5 crore). Both were nearly finished in January 2026.
Drains and sewers. In May 2022 the Corporation gave work orders worth Rs 150.45 crore, from a KfW loan, for new drains on 139 streets in areas including Sadasivam Nagar, Madipakkam and Ram Nagar. In January 2024 drain work began on Dr Ambedkar Salai. Metrowater's Madipakkam sewer scheme, approved at Rs 256.90 crore in January 2022, was opened by the Chief Minister in May 2025.
Canals. The councillor said the MLA has the two big canals that carry water to the Pallikaranai marsh cleaned and desilted before each rainy season.
What is still waiting
In July 2024 Dinamalar found more than ten streets in Rajalakshmi Nagar and Periyar Nagar turned to clay mud. Drain work had gone on for over a year and was left half done in places, while sewer pipes were also being laid. More than 1,000 families were affected.
On Dr Ambedkar Salai the trench was left open in late May 2024, and residents crossed it on a wooden plank. Officials blamed the election code and promised to relay the road by the end of June 2024. We found no later report.
The councillor said drain workers cut new Metrowater pipes by mistake, so water connections had to be redone. Residents told Citizen Matters that autos would not enter some streets and shops were losing trade.
After Cyclone Michaung in 2023 she asked for the Pallikaranai marsh to be widened and deepened. She was also thinking of a library and a women's gym. Neither has been reported as done.
What was never reported
We found no report on the cost of the ration shop, or on whether it has opened. We do not know how the ward fund was used after the first year.
The final cost of the sewer scheme for Madipakkam alone was never given. The state approved Rs 256.90 crore in 2022, but when the scheme was opened, one figure of Rs 188.55 crore was given for Madipakkam, Pallikaranai and Mugalivakkam together. How much of the KfW drain money was spent in this ward is not published.
We found no work in this ward paid from the MLA's fund (MLACDS), the MP's fund (MPLADS) or Singara Chennai 2.0.
Before this council was elected, a ward 188 drain desilting contract given in August 2021 was not finished. In an RTI reply in February 2022, the Corporation admitted this helped cause the November 2021 floods.
How you can check
Ask the councillor's office. Call 9445467188 or write to [email protected]. Ask for the list of works paid from the ward fund each year, with the street and the cost.
Go to your Area Sabha. Each ward is split into areas, and the councillor chairs a meeting for each area four times a year, on or near 25 January, 14 April, 15 September and 10 December. Ask which works the ward fund paid for and which are planned, and ask for the written minutes. These meetings are often put off, so ask the councillor for the date in advance.
Use the Right to Information (RTI) Act. Write to the Public Information Officer of the Greater Chennai Corporation for Zone 14 (Perungudi). The fee is Rs 10, and copies cost Rs 2 a page. Ask for papers, not opinions: the work order, the estimate, the measurement book, the completion certificate and the payments for one named work. You can also ask to see the files. The first hour is free.
Works, one by one
- Under wayNew ration shop building to replace an old one that could no longer be used, with a small space for women's self-help groupsNear Madipakkam bus stand · First-year ward fund; being built in July 2024 · ward fund
- Not knownA library and a women's gym (being considered for the next fund)Ward 188 · Considered in July 2024 · ward fund
- Under wayRepairs to 16 streets beside the bus stand, and to Ramamurthy Nagar Main Road and nearby roads. Started by the then MLA, S. Aravind Ramesh.Streets beside Madipakkam bus stand; Ramamurthy Nagar Main Road · Started Feb 2026 · ₹84 lakh · other
- Under wayDog shelter of about 9,000 sq ft with a vet's room, treatment room and laboratory, ordered by the Corporation Commissioner (fund not named)Tambaram-Velachery Road · Started late Dec 2025 · ₹475 lakh · other
- Under wayAnimal birth control centre on the same campusTambaram-Velachery Road · Nearly finished Jan 2026 · ₹150 lakh · other
- Under wayCattle shelter (gosala) on the same campusTambaram-Velachery Road · Nearly finished Jan 2026 · ₹250 lakh · other
- Under wayNew storm water drains under the KfW (German bank) loan for the Kovalam basin. One set of work orders, Rs 150.45 crore in all, covers 139 streets in Sadasivam Nagar, Madipakkam, Ram Nagar and other areas; no figure for this ward alone.Sadasivam Nagar, Madipakkam, Ram Nagar and other areas · Work orders May 2022 · other
- Not knownStorm water drain; trench left open in May 2024 and road relaying promised by end of June 2024Dr Ambedkar Salai · Started Jan 2024 · other
- StalledStorm water drain and sewer work left half done; more than ten streets turned to mudRajalakshmi Nagar and Periyar Nagar · 2023-24 · other
- DoneMadipakkam underground sewerage scheme by Metrowater. Approved at Rs 256.90 crore for all of Madipakkam in January 2022; opened by the Chief Minister on 29 May 2025.Across Madipakkam, including ward 188 · 2022 to 2025 · other
- Under wayRelaying roads after sewer pipes. In June 2023 sewer pipes had been laid in 124 of the 457 roads in wards 187 and 188, and 40 of them had been handed back for relaying.Wards 187 and 188 · 2023 · other
- Not knownCleaning and desilting the two big canals that carry water to the Pallikaranai marsh, arranged by the MLA before each rainy season (fund not stated)Canals from ward 188 to the Pallikaranai marsh · Yearly, as of 2024 · other
- Not knownHiring a JCB to clear standing rain water. One contract of Rs 9.99 lakh covers wards 185, 186, 187 and 188 together.Wards 185 to 188 · Sept 2026 · other